The SUE Solution's team effectively completed an extensive utility asset evaluation.
The SUE Solution's team successfully completed the utility research, mapping, and inventory of this 3.5 mile corridor.
SUE Solutions contracted with Civil Science to perform the utility investigation tasks on this project.
This UDOT project was a fast track project that includes a mill and overlay of the existing 12th Street (SR-39) roadway.
SUE Solutions successfully completed the Quality Level 'B' and Quality Level 'A' utility locating.
SUE Solutions performed Quality Level 'A' Subsurface Utility Engineering services for this culvert improvement project.
This project received this comment from the UDOT Project Manager, "delivered a quality product in a timely manner."
The SUE Solution’s team successfully completed the utility research, mapping, and inventory of this 7 mile corridor in Logan.
SUE Solutions locating services were completed through the use of non-destructive means to expose existing utilities.
The SUE Solution’s team successfully completed Phase I of the utility research, mapping, and inventory of this project.
SUE Solutions successfully performed Quality Level ‘A’ potholing services through the use of non-destructive means.
Utilities potholed and exposed consisted of culinary water lines and pressurized irrigation water lines.
SUE Solutions used video inspection to locate utilities ahead of schedule and under budget, despite poor weather.
Received a 4.8 project rating out of 5. UDOT project manager indicated their desire to use SUE Solutions again.
SUE Solutions successfully completed the Quality Level 'B' locating services for the SR-89; Main Street, Kanab project.
The general scope of the planned project includes widening and partial reconstruction of the SR-139 corridor.
The SUE Solution's team successfully completed the utility research, mapping, and inventory for this project.
The SUE Solution's team effectively completed an extensive utility asset evaluation using Quality Level 'A' services.
SUE activities included Quality Level 'B' (horizontal designating) and Quality Level 'A' (vertical test holes).
The SUE data collected ultimately saved the Idaho Transportation Department over 1 million dollars through an innovative design.
This project received this comment from the UDOT Project Manager, "a quality SUE document within budget and on time."
Approximately 3,000 feet of these "private" utilities were located and mapped to the accuracy levels dictated by UDOT standards.
In conjunction with UDOT’s contracting, SUE Solutions mobilized crews to the field within a week of initial contact.
This is an Economic Stimulus project and required UDOT and SUE Solutions to act quickly to get the project contracted.
The utility data collected during this project was then integrated into previously developed utility plans.
SUE Solutions was able to mobilize their crew and complete the SUE tasks in a cost effective and timely manner.
Through SUE Solutions’ extensive and thorough utility research, buried CATV and buried Fiber Optics were avoided.